• Deep Water Solo Exeter 2014

    An Entre-Prises solution The Entre-Prises designers ensured maximum visibility by developing a structure that could be installed on a floating pontoon. The wall was positioned facing the quay to give spectators the best possible view of the show. Pour le mur, nous avons utilisé notre surface MozaiK We used our MozaiK surface for the wall, […]

    Read More

  • IFSC World Climbing Championships – Bercy 2012

    An Entre-Prises solution Entre-Prises designed “the World Cup Boulders”World Cup Boulders » : Eight different modular climbing faces that can be assembled according to route setters’ and customers’ needs and wishes. These faces can be arranged in various configurations. The faces can either be fixed to a support or arranged in free-standing assemblies of two or four. […]

    Read More

  • The Boardroom Climbing Ltd, United Kingdom

    An Entre-Prises solution La technologie MozaiK technology for greater flexibility in route setting 50 climbing routes up to 10m high World Cup boulders and other boulders up to 4.8 high An 8 metre “psicobloc” wall with a large landing area. A dedicated training area, systems board, campus board, and gym rings. A specially designed area for […]

    Read More

  • USA Climbing competition wall

    An Entre-Prises solution Entre-Prises created a structure that fits perfectly with the existing structure and offers varying degrees of difficulty and varied profiles to suit different climbing styles. Special attention was given to ensuring easy installation and take-down, which are key criteria for competition walls. Location Boulder, United States Climbable area 213 m² Date January […]

    Read More